Skip to main content
linkedin
instagram
youtube
tel
Reach Us: +30 2108064543 & +30 2108055495
Select your language
English
Greek
Company
Profile
Publications
Services
Projects
List
Map
Careers
Contact
Breadcrumb
Home
Projects
Service
- Any -
Consulting
Design
Research
Expertise
- Any -
Capacity building
Dams and Reservoirs
Environmental
Geographical Information Systems
Geotechnical
Health & Safety Plans
Hydrology
Irrigation
Power
Procurement
Project finance
Project Management
Software development
Structural
Surveying
Tender documents
Wastewater
Water
Water Resources Management
Client
- Any -
AKTOR S.A.
APION KLEOS CJV
Astakos Terminal SA
Athens Water Supply and Sewerage Company (EYDAP SA)
Attiki Odos J/V
DG Environment - European Commission
Greek ministry for the Environment, Special Water Secretariat
Hellenic Ministry of Agriculture
Hellenic Ministry of Environment, Physical Planning and Public Works
Hellenic Ministry of Environment, Physical Planning and Public Works / Department D6
Hellenic Ministry of Infrastructure and Transport
Hellenic Ministry of Rural Development and Food
Ministry of Culture
Municipal Enterprise for Water Supply and Sewerage of Volos (DEYAMV)
Municipal Enterprise for Water Supply and Sewerage of Κarditsa (DEYAK)
Municipal Water & Sewerage Enterprise of the City of Karditsa (D.E.Y.A.K.)
Municipal Water & Sewerage Enterprise of the wider City of Volos (D.E.Y.A.M.V.)
Municipality of Saronikos
P. Nikolaides & Associates LTD
Porto-Carras SA
Prefecture of Attika
Prefecture of Crete
Prefecture of East Attika
SYSTAS K.MICHALOPOULOS & ASSOCIATES
TOMI SA
Jan 14
By admin
Aposelemis Dam, Water Treatment and Water Supply Projects in Northern Crete
The dam is 56 m heigh. It is of rockfill type with an impervious clay core, upstream and downstream rock…
Jan 13
By admin
Design of the Smokovo irrigation network
Designed works include: A main water intake steelpipe is 2500mm, combined with a hydroeletric power…
Jan 13
By admin
Hydraulic design and hydrology reports of Patra-Pyrgos-Tsakona (PAPYTSA) Olympia Odos Highway
The new Patra - Pyrgos - Tsakona (PAPYTSA) Motorway follows, in general terms, the same route as the…
Jan 12
By admin
Gadouras dam. Water treatment and supply works in Rhodes island
The project includes the Gadoura dam and appurtenant works construction, the water mains to the town of…
Jan 12
By admin
Design of water supply works (pipelines-treatment plant) for Athens
Designed works include: A main 6.25Km long external pipeline with diameter 1700mm and 5.5 m3/sec flow…
Jan 12
By admin
Design of the water supply extension of the Gadouras dam pipelines and water mains to the city of Rhodes
The project involves the extension of the existing pipeline to a wider area, covering potable water…
Jan 12
By admin
Technical Consultant for the preparation of a water supply masterplan for the island of Lesvos
A set of necessary works are suggested, along with water conservation and environmental objective target…
Jan 12
By admin
Design of an RCC dam and related structures for the Porto Carras resort in Halkidiki
The project includes the dam, spillway and energy dissipation, water intakes and road access.
Jan 12
By admin
Study ot the water supply network and technical consultant for assisting DEYAMV in modernisation, zone separation and automatization of the water network of Volos region
Pipeline and network design for the water supply of the city of Volos and its suburbs
Jan 12
By admin
Attiki Odos Highway hydraulic works
The purpose of the studies was the rehabilitation and extension of existing water supply, stormwater and…
Jan 12
By admin
Extension of the water supply network of Karditsa
Design revision was necessary due to the network’s extension.
Jan 12
By admin
Final study of the primary and secondary irrigation and drainage network of area II in Serres
This project is part of the reallocation plan for the plain.
Jan 12
By admin
Environmental flood protection works in urban areas - Adjustment of Xerias stream in Korinthos
Xerias river basin has an area of 174 km2 and extends from the town of Korinthos (North) to the Southern…
Jan 12
By admin
i-adapt: Innovative approaches to halt desertification in Pinios. Piloting emerging technologies
The project seeks to provide a specific, actionable plan for combating desertification based on emerging…
Jan 12
By admin
Implemetation of RBMP's at the river basins districts of Peloponnese, European Comission's Water Framework Directive 2000/60/EC, Act 3199/2003 and P.D. 51/2007
This study was separated at three phases. The documents required at each phase were: A Phase The…
Jan 12
By admin
Triantafyllia dam and appurtenant structures design / Technical Consultant for Triantafylia dam works construction
It is a rockfill dam with clay core, 77m high and 560m crest length. The total volume of the dam is 2.…
Pagination
Current page
1
Page
2
Next page
Next ›
Last page
Last »
Top