Jan 11 By admin nikopolis-1
The water supply/irrigation system design proposals were all in accordance to the archealogical site…
Jan 11 By admin elbasan-1
Gabion wall scour protection works. Culvert design and energy dissipation works. River training works…
Jan 11 By admin lassithi-1
Construction of a 90Km long external pipeline from the Aposelemis Dam water treatment plant to Agios…
Jan 11 By admin pikermi-1
Main and secondary sewer network design.
Jan 11 By admin kalyvia-1
Design of an ~118Km extension sewer network.
Jun 13 By admin aposelemis-2
Potential failure mechanisms (overtopping and piping) were considered. 1D and 2D flood wave propagation…
Jun 13 By admin gadouras-2
Potential failure mechanisms (overtopping and piping) were considered. 1D and 2D flood wave propagation…