Skip to main content
linkedin
instagram
youtube
tel
Reach Us: +30 2108064543 & +30 2108055495
Select your language
English
Greek
Company
Profile
Publications
Services
Projects
List
Map
Careers
Contact
Breadcrumb
Home
Water
Jan 14
By admin
Aposelemis Dam, Water Treatment and Water Supply Projects in Northern Crete
The dam is 56 m heigh. It is of rockfill type with an impervious clay core, upstream and downstream rock…
Jan 13
By admin
Hydraulic design and hydrology reports of Patra-Pyrgos-Tsakona (PAPYTSA) Olympia Odos Highway
The new Patra - Pyrgos - Tsakona (PAPYTSA) Motorway follows, in general terms, the same route as the…
Jan 12
By admin
Gadouras dam. Water treatment and supply works in Rhodes island
The project includes the Gadoura dam and appurtenant works construction, the water mains to the town of…
Jan 12
By admin
Design of water supply works (pipelines-treatment plant) for Athens
Designed works include: A main 6.25Km long external pipeline with diameter 1700mm and 5.5 m3/sec flow…
Jan 12
By admin
Design of the water supply extension of the Gadouras dam pipelines and water mains to the city of Rhodes
The project involves the extension of the existing pipeline to a wider area, covering potable water…
Jan 12
By admin
Study ot the water supply network and technical consultant for assisting DEYAMV in modernisation, zone separation and automatization of the water network of Volos region
Pipeline and network design for the water supply of the city of Volos and its suburbs
Jan 12
By admin
Attiki Odos Highway hydraulic works
The purpose of the studies was the rehabilitation and extension of existing water supply, stormwater and…
Jan 12
By admin
Extension of the water supply network of Karditsa
Design revision was necessary due to the network’s extension.
Jan 12
By admin
Environmental flood protection works in urban areas - Adjustment of Xerias stream in Korinthos
Xerias river basin has an area of 174 km2 and extends from the town of Korinthos (North) to the Southern…
Jan 12
By admin
i-adapt: Innovative approaches to halt desertification in Pinios. Piloting emerging technologies
The project seeks to provide a specific, actionable plan for combating desertification based on emerging…
Jan 12
By admin
Triantafyllia dam and appurtenant structures design / Technical Consultant for Triantafylia dam works construction
It is a rockfill dam with clay core, 77m high and 560m crest length. The total volume of the dam is 2.…
Jan 12
By admin
Consultant for the Implementation of Feasibility Study and Environmental Studies adjustment for the Acheloos river diversion works to Thessaly plain
Masterplan for the diversion works considering hydrologic data, environmental issues and hydro-power…
Jan 11
By admin
Highway design for the update of the New National Road into a Highway (ΠΑΘΕ), section: Stylida - Raches (Chainage 12+000 - 32+000)
The stormwater and drainage works design of the 180km2 basin refer to : The main highway, 19.235 km long
Jan 11
By admin
Archeological site of Nikopolis. Water supply, irrigation and stormwater systems design
The water supply/irrigation system design proposals were all in accordance to the archealogical site…
Jan 11
By admin
Hydraulic works design in parts of the Tirana - Elbasan highway
Gabion wall scour protection works. Culvert design and energy dissipation works. River training works…
Jan 11
By admin
Design of Lassithi plateau diversion tunnel to Aposelemis dam and its water supply extension to Agios Nikolaos
Construction of a 90Km long external pipeline from the Aposelemis Dam water treatment plant to Agios…
Pagination
Current page
1
Page
2
Next page
Next ›
Last page
Last »
Top